Back
Finance & Investment

Austral hits 3% Copper as Drilling tests Enterprise Growth

Jane Morgan Management

Figure 3: Chalcopyrite-bornite-pyrite mineralisation observed in 26ENTRC005 (221-225m),
compared with chalcopyrite-pyrite mineralisation from historical drillhole ENTRCD005 (173.2m)
Figure 3: Chalcopyrite-bornite-pyrite mineralisation observed in 26ENTRC005 (221-225m), compared with chalcopyrite-pyrite mineralisation from historical drillhole ENTRCD005 (173.2m)

24 November 2026 – Brisbane, QLD | Austral Resources (ASX: AR1) has intersected 14 metres grading 3.00% copper in the first results from its 2026 drilling at Enterprise, as the company tests where higher-grade copper continues and whether the deposit extends beyond its current resource. 

The interval began at 118 metres downhole and included 11 metres at 3.70% copper. A separate hole intersected several zones of copper sulphides, including 27 metres at 1.21% copper from 151 metres and 13 metres at 1.73% from 228 metres. Austral estimates true widths at about 60% of the reported drill lengths, with local variation.

Enterprise has an existing inferred mineral resource of 950,000 tonnes at 0.97% copper, using a 0.5% copper cut-off. Historical drilling for that estimate covered nearly 800 metres along the deposit, with drill sections about 120 to 125 metres apart. The drilling programme aims to establish how consistently copper grades carry between those sections.

The deeper sulphide intersections support Austral’s interpretation of where higher-grade copper may continue at depth. Surface sampling also identified elevated copper levels along about two kilometres, and Austral has yet to test that full length.

Austral Resources Chairman David Newling said:

"Enterprise is the latest in a strong run of results from our exploration team this year. It points to real upside not only at Enterprise but across AR's broader 5,000 km² of tenure, which anchors our organic growth strategy.
Taken together, Snow Queen, McLeod Hill, Canyon, Waterhole and now Enterprise show a clear development pathway for the Company as it works towards becoming Australia's next mid-tier copper powerhouse."

Austral plans a further 17 holes to test deeper, higher-grade targets and extensions beyond the existing resource. It will report assay results progressively after validation. The company also plans preliminary tests to assess how near-surface material might respond to processing and will use the new drilling and density measurements to update its resource model.


About us:

About Austral Resources Australia Ltd

Austral Resources is building Australia’s next mid-tier copper powerhouse, shaped by our pure-play Queensland copper focus and dual-processing platform – a combination that gives us a rare position in the market. Backed by established infrastructure and disciplined, long-term growth, our foundation is resilient; and as a reliable partner to our stakeholders, our measured delivery is driven by experience and accountability.

Austral Resources is an ASX (ASX:AR1) listed copper producer operating in Queensland, Australia. The Company operates dual processing facilities: Western Operations (Mt Kelly) a copper oxide heap leach and solvent extraction electrowinning (SX-EW) plant with a nameplate capacity of 30,000tpa of copper cathode; and Eastern Operations (Rocklands) a copper sulphide concentrator with a nameplate capacity of 3Mtpa. The Company owns a significant copper inventory with a JORC compliant Mineral Resource Estimate standing at 64 Mt @ 0.73% Cu (468,414t of contained copper), alongside 2,101km2 of highly prospective exploration tenure in the heart of north west Queensland, a world class copper and base metals province.

 


Contact details:

Matthew Beattie
Chief Financial Officer
P: +61 419 523 719
E: [email protected]

Wilamina Russo
Investor & Media Relations
M: +61 450 646 609
E: [email protected]

Images

Figure 3.png

Figure 3: Chalcopyrite-bornite-pyrite mineralisation observed in 26ENTRC005 (221-225m), compared with chalcopyrite-pyrite mineralisation from historical drillhole ENTRCD005 (173.2m)
Download
Attachments

2A1712434_AR1.pdf

Download