Back
Finance & Investment

New Murchison Gold Delivers Fourth Consecutive Month of Production Growth as Gold Hits Record Highs

Jane Morgan Management

Progression of Stage 1 pit inside larger Stage 2 pit boundary
Progression of Stage 1 pit inside larger Stage 2 pit boundary

Perth, Australia – 21st January 2026 – New Murchison Gold Limited (ASX:NMG) has delivered its fourth consecutive month of increasing gold production from the Crown Prince Gold Mine in Western Australia’s Murchison goldfields, coinciding with record Australian gold prices exceeding A$7,000 per ounce.

The Company has now completed its first full quarter of production, selling 184,746 dry tonnes of ore at an average grade of 4.0g/t gold, representing 22,766 ounces of gold for the December 2025 quarter.

Crown Prince has transitioned successfully from ramp-up to steady-state operations, generating strong cash flow and ending the quarter with A$92 million cash at bank.

Alex Passmore, Chief Executive Officer of New Murchison Gold, said:

“Crown Prince Gold Mine continues to deliver strong ore production to the Bluebird mill enabling significant cash flow generation for NMG. With a strong balance sheet the Company is well placed to advance our near-term production prospects within the broader Garden Gully tenure package.”

In parallel with production success, New Murchison Gold has recently released high-grade drill results from the Lydia Gold Prospect, located approximately 800 metres from Crown Prince and on a granted mining lease. The results highlight the potential to add additional tonnes and ounces into the existing production pipeline.

“We believe we can leverage off existing infrastructure to bring Lydia online relatively quickly,” Mr Passmore said.

With production growing, a strong balance sheet, and gold prices at record highs, New Murchison Gold is well positioned to continue delivering shareholder value.


About us:

ABOUT NEW MUCHISON GOLD

New Murchison Gold Ltd (ASX:NMG) is a mineral exploration and gold mining company which holds a substantial package of tenements in the prolific Murchison goldfield near Meekatharra, Western Australia. The Company is focused on the Garden Gully Gold Project which comprises a 677km2 tenure package covering the Abbotts Greenstone Belt and other key regional structures. The project has multiple gold deposits along the belt with the most advanced being the Crown Prince Gold Mine. Gold mineralisation in the belt is controlled by major north trending structures and contact zones between felsic and mafic metamorphosed rocks. NMG updated its Mineral Resource Estimate in November 2024 and reported a maiden Ore Reserve and Feasibility Study for the Crown Prince Deposit in February 2025. As announced 25 June 2025 the Company made a decision to develop the Crown Prince Gold Mine and completed its first blast on 30 June 2025. NMG commenced production in September 2025.


Contact details:

Media Enquiries

Jane Morgan Management

Jane Morgan

+61 405 555 618

[email protected]

 

Images

Image 1.png

Progression of Stage 1 pit inside larger Stage 2 pit boundary
Download

Figure 1.png

Figure 1: Distribution of the recent Lydia drill holes (see corner insert) within the Abbotts Greenstone Belt
Download

Figure 2.png

Figure 2: Distribution of the recent significant intercepts over the Lydia Shear Zone
Download

Figure 3.png

Figure 3: Cross section over the Lydia Shear Zone showing the recent high-grade gold intercept in NGGRC1094 hole
Download

Figure 4.png

Figure 4: Cross section over the Lydia Shear Zone showing the high-grade gold intercepts in NGGRC1112-1144
Download

Figure 5.png

Figure 5: Plan view over the designed Lydia pit with the drill hole traces and major mineralised shear zone
Download

Figure 6.png

Figure 6: Plan view over the Lydia South shears showing the gravity heights and recent intercepts
Download

Figure 7.png

Figure 7: Cross section over the new Lydia South shear zone
Download

Figure 8.png

Figure 8: Lydia East plan view with drill traces and gold intercepts
Download
Attachments

6A1307783_NMG.pdf

Download

6A1306807_NMG.pdf

Download