Back
Finance & Investment

Spectacular Results Confirm Quality of Titan Minerals' Dynasty Gold System

Jane Morgan Management

14 January 2026 – Perth, Australia | Titan Minerals Limited (ASX:TTM) has today reported exceptional infill drilling results from its 100% owned Dynasty Gold Project in southern Ecuador, reinforcing the scale, grade and continuity of the Dynasty gold system and supporting planned upgrades to the project’s Mineral Resource Estimate (MRE).

Recent infill drilling completed at the Cerro Verde prospect, focused on the Brecha-Comanche target, delivered a series of wide, high-grade gold-silver intercepts from shallow depths. These results further improve confidence in the mineralisation model and are expected to support both scale and confidence upgrades in the next MRE, which is targeted for completion in late Q1 2026 upon receipt of all outstanding 2025 assay results  .

Key results from the latest drilling include:

  • 38.5m @ 3.0 g/t Au, 5.6 g/t Ag from 168.8m, including 7.5m @ 11.0 g/t Au, 12.7 g/t Ag from 174.5m in CVDD25-173. 

  • 8.6m @ 5.9 g/t Au, 9.5 g/t Ag from 64.6m in CVDD25-177. 

  • 9.5m @ 4.2 g/t Au, 12.1 g/t Ag from 150.5m, including 5.3m @ 7.4 g/t Au, 19.4 g/t Ag from 152.2m in CVDD25-171. 

  • 4.1m @ 7.2g/t Au, 26.9g/t Ag from 13.5m in CVDD25-178.

In addition to vein and breccia-hosted mineralisation, drilling completed in late 2025 intersected broad zones of porphyry-hosted gold-silver ± copper mineralisation at Cerro Verde. Assay results from drilling at the Kaliman porphyry target are expected in the coming weeks.

Titan will pause drilling briefly while remaining assay results from the 2025 campaign are received and compiled. During this period, the geology team will continue advancing reconnaissance mapping and trenching programs across new and extensional target areas outside the current resource footprint at Cerro Verde, where substantial additional mineralisation potential has already been identified.

Titan’s CEO, Melanie Leighton, commented:

“I’m excited to share these latest drill results which demonstrate the pedigree of the Dynasty gold system and its ability to consistently deliver exceptional wide, high-grade results from shallow depths. To deliver a result of 38.5m @ 3.0 g/t Au, 5.6 g/t Ag is a phenomenal result that will likely lead to resource upgrades (scale and confidence) at the Brecha-Comanche target, Cerro Verde prospect.” 

“Our infill drilling has highlighted the quality and remarkable predictability of the Dynasty gold orebody, with latest results set to support resource classification upgrades and a robust MRE update suitable for feasibility studies.” 

“A pause in drilling will allow receipt and compilation of 2025 drill results and for the team to plan the next phase of drilling, which will be a combination of exploration to test new and conceptual targets, and resource extensions identified from latest geological and mineralisation modelling. 2026 promises to be an exciting and pivotal year for TTM with many frontiers of growth and a potential deal with Lingbao to be negotiated.”


About us:

About the Dynasty Gold Project

The Dynasty Gold Project is an advanced exploration- early resource stage project comprising five contiguous concessions and is 139km2 in area. Three of these concessions received Environmental Authorisation in 2016 and are fully permitted for all exploration and small-scale mining activities. Exploration work at the Dynasty Gold Project has outlined an extensive zone of epithermal veining over a ninekilometre strike. There is also considerable potential for porphyry copper mineralisation as identified by surface mapping, trenching, and drilling at the Kaliman prospect and by surface geochemistry and mapping at the Cola and Gisell prospects.


Contact details:

Jane Morgan Management
Investor & Media Relations
[email protected]

Attachments

TTM - ASX (14 January 2026).pdf

Download