Theta Gold Mines Secures Dual Titan Ball Mills for TGME Plant Build
Theta Gold Mines Limited
✅ Performance Guaranteed – Each mill comes with a full commissioning package, onsite training, and a robust service agreement—critical assurances that strengthen confidence and support bank financing.
✅ OEM Support Within 4 Hours – MechProTech’s proximity to site ensures rapid response and maintenance capability.
✅ Innovative Plug-and-Play Contracting – Mills and infrastructure are built offsite, then transported for fast installation, reducing build time and capital costs.
✅ Redundancy Built In – Dual mill configuration ensures operational flexibility and minimizes downtime during maintenance.
This milestone accelerates the pathway to first gold production and sets a new benchmark in operational excellence.
Learn more: http://www.thetagoldmines.com
Contact details:
Joe Kaderavek
Engage IR
0434563456